The width printed for a metal roof sheet is not necessarily the width it covers after installation. This Australian guide uses the effective cover and fixing details published for one LYSAGHT TRIMDEK profile, then explains why end laps and sheet lengths must be confirmed with the supplier.

Published:

Wooden toolbox and gloves
In this guide
  1. Cover width versus overall sheet width
  2. Profile dimensions and minimum pitch
  3. End laps and long roof planes
  4. Worked roof example from the calculator
  5. Ordering lengths and working safely
  6. Before you finalize the estimate
  7. Frequently asked questions
  8. Sources

Cover width versus overall sheet width

A profiled sheet overlaps its neighbour at the side. Effective cover width is the width remaining for the roof after that side-lap is made. The LYSAGHT TRIMDEK product page lists a nominal cover width of 762 mm and a minimum roof slope of 2 degrees. These are values for that profile, not a generic dimension for corrugated or ribbed roofing. The profile supplier’s current design and installation documents are the reference for its details.

To estimate the number of sheets across a roof plane, divide the measured ridge length by the profile cover width and round up to a whole sheet. A 9 m edge divided by 0.762 m is 11.81, so the calculator rounds to 12 sheets across. The horizontal run is a separate dimension: pitch converts it to the approximate sloping sheet length. Measure each plane separately and use the calculator only for the profile and layout it supports.

Profile dimensions and minimum pitch

Do not assume that two sheets with similar ribs have the same cover width, minimum pitch, fastener schedule or weathering detail. The TRIMDEK page identifies its cover and minimum pitch, and the installation guide explains which edge forms the underlap. If you switch profile or supplier, update the inputs from the matching product data. A small width change can add a whole sheet across a roof.

The minimum pitch is a product constraint, not an estimate of the correct roof design. Actual compliance can depend on the complete roof system, end details, support arrangement, rain exposure and local requirements. If the roof is below the profile’s minimum slope or has unusual valleys, penetrations or wind exposure, ask the manufacturer or a qualified roofer to review the detail before ordering.

Sheet count across example ridge lengths using the cited 762 mm TRIMDEK cover width. This is a width count only.
Measured ridge lengthCalculationSheets across
6 mceil(6 ÷ 0.762)8
9 mceil(9 ÷ 0.762)12
12 mceil(12 ÷ 0.762)16

End laps and long roof planes

TRIMDEK guidance says end laps are not usually necessary because the cladding is available in long lengths. If an end lap is needed, the manufacturer says to seek advice about the laying sequence and overlap amount. The roofing calculator therefore asks you to enter the maximum sheet length and lap rather than silently applying a universal overlap. The chosen project input affects how many sections are needed along the slope.

An end lap is a weathering detail as well as a quantity input. The lap amount and position need to follow the profile instructions and roof design. Do not decide the overlap from a generic online table or transfer a value from another sheet. Confirm the available transport length, safe handling limits, fastening arrangement and cut plan with the supplier before buying long sheets.

Worked roof example from the calculator

The Australian calculator example uses a symmetrical gable with two planes, each 9 m along the ridge, a 4 m horizontal run and a 25 degree pitch. It calculates the sloping length as 4 ÷ cos(25 degrees), approximately 4.41 m. With the 762 mm cover profile, the 9 m width takes 12 sheets across each plane, or 24 sheet pieces for both planes. This example does not require an end lap because the selected maximum sheet length is 6 m.

The same example uses a sourced screw rate associated with a chosen support spacing. That count is not transferable to a different framing layout or wind classification. Ridge and barge flashing are estimated only from the lengths entered by the user. Hips, valleys, skylights, chimneys, gutters and custom flashings need separate measurement and detailing.

Ordering lengths and working safely

Before a quote, give the supplier the measured ridge length, horizontal run, pitch, profile, support spacing, roof plane count, sheet lengths and any end-lap proposal. Confirm whether the quoted length includes gutter projection or another end detail. Check that the profile, colour, finish and fastener system match across all pieces, and ask the supplier to review the cut schedule.

Roof sheets are large, sharp and awkward to lift. Work at height introduces serious fall risks, and sheets can behave unpredictably in wind. Plan access, lifting and fall protection with a qualified roofer. The calculator is a material take-off only; it does not assess structural capacity, waterproofing, wind design or compliance.

Before you finalize the estimate

Before ordering, request a supplier check of the profile, roof-plane drawing, measured pitch, cover width, sheet lengths, side-lap orientation, fastening schedule and any proposed end laps. Include access and handling limits in the plan because the longest theoretical sheet may not be practical to lift safely.

Keep the project dimensions and profile source on the take-off. Any change in the selected profile or pitch should trigger a new check against the manufacturer’s guide. A qualified roofer must review structural and weathering details that the material calculator does not assess.

Make it your project.

Use the supporting calculator with your measured dimensions and the product you plan to buy. Read its worked example, sources and assumptions before ordering.

Open the AU calculator

Frequently asked questions

What does roof sheet cover width mean?

It is the effective width one installed sheet covers after the side overlap. Use the figure published for the exact profile being ordered.

How many TRIMDEK sheets do I need for a 9 m roof edge?

At 762 mm nominal cover, ceil(9 ÷ 0.762) gives 12 sheets across one plane, before considering roof shape and any supplier layout changes.

How much should roof sheets overlap at the ends?

The cited TRIMDEK guide says end laps are not usually needed and directs users to seek manufacturer advice if they are used. Confirm the exact overlap for your profile and roof.

Can I use 762 mm for any metal roof sheet?

No. It is the nominal cover width for the cited TRIMDEK profile. Other profiles can have different cover widths and installation limits.

Does the calculator check roof structure or safety?

No. It estimates sheet sections, selected fasteners and measured flashings. It does not design the roof or make working at height safe.

For general information only, not professional advice. Rules and prices change, so check the official sources below. Use your own judgement and speak to a qualified builder or engineer before you act.

Sources

Keep DIYSums handy

Open your browser’s menu and choose Add to Home Screen or Install app.

This lightweight app needs an internet connection. Your calculator inputs stay on your device.

Share calculator