Garden & outdoors
How Many Fence Panels and Posts Do I Need?
Count UK fence panels, posts and post mix from measured runs, including gates, corners and partial bays.

In this guide
Measure the fence line and choose a panel
Measure each straight section along the intended fence line. Leave gate openings out of those run lengths and record the opening separately. Note corners, changes of direction, slope transitions and end conditions because these can need support positions beyond the ordinary straight-run count. Check your boundary and service locations before digging.
The UK fence calculator uses a 1.83 m panel width from a cited standard close-board product example. Its data also records a small range of panel heights and gravel-board lengths from UK product sources. These dimensions describe referenced products; they are not an industry-wide standard. Check the exact supplier model, installed width, post arrangement and available lengths before you use the numbers.
The calculator rounds each run up to whole panel widths. This gives a purchase count, not a cut plan. The final bay may need trimming, and the first or last panel may be fitted differently depending on the posts and boundary. Ask the supplier how the panel fixes to its post system and whether cut ends need treatment.
Panels, posts and gravel boards
For a single straight 10 m run, divide 10 m by 1.83 m per panel. The result is about 5.46 widths, so the calculator rounds up to six panels. A single straight run needs one post position at each end plus one between each pair of panels, giving seven standard fence posts. A corner or additional separately entered run changes that count.
If the design includes a gravel board, the tool counts one board per panel at the selected height. The UK source lists 1.83 m board lengths as an example. Check whether the supplier’s actual board fits the panel bay and how it attaches to the selected posts. Extra courses, retaining loads and cuts are outside the simple count.
For a gate, measure the opening separately and add two gate-post positions. The calculator excludes the opening from fence-only runs, but it does not estimate gate-post concrete because the cited post-mix allowance applies to standard fence posts only. Heavy gates, sloping ground and corner posts can require a different post and footing design.
| Material | Calculation | Estimate |
|---|---|---|
| Fence panels | ceil(10 ÷ 1.83) | 6 panels |
| Standard fence posts | 6 panels + 1 end position | 7 posts |
| 20 kg post-mix bags | 7 standard posts × 1 sourced bag each | 7 bags |
| Gravel boards | One per panel when selected | 6 boards |
A checked calculator example
The calculator’s result combines the count for each run with entered corners, slope steps and gates. It keeps standard fence posts and gate posts separate. This distinction matters: the source for post-mix says one 20 kg bag per standard fence post, while the product data does not confirm the same amount for a gate post. The shopping list therefore does not silently apply that assumption to gates.
The worked 10 m example produces six panels and seven standard posts. At the sourced one-bag-per-standard-post example, it estimates seven bags. If you add one gate, the tool lists two gate-post positions separately, but it does not add post-mix for them. Obtain a specific gate foundation quantity from the supplier or installer instead of copying the standard post count.
The estimator does not optimize leftover panel pieces across separate runs. It also does not include cutting waste, special end posts, fixings, concrete for gates, soil disposal or labour. Compare the generated material list with the supplier’s system components and ask whether posts, rails, caps and gravel boards are sold individually or in packs.
Planning permission and boundary checks
Planning Portal guidance for England says a new fence, wall or gate generally falls within the cited permitted-development conditions when it is no more than 1 m high beside a vehicle highway or its footpath, or no more than 2 m elsewhere. Its page lists exceptions for listed-building sites or boundaries and cases where an Article 4 direction or planning condition removes the right. It is England guidance, not a rule for all UK nations.
Measure the proposed overall boundary height from the relevant ground level and check local planning conditions, conservation-area controls and any listed-building status. Where a wall, slope, trellis or raised ground affects the measurement, ask the local planning authority rather than relying on a quick panel-height comparison. Planning permission is only one check; ownership, title restrictions and neighbour agreements may also matter.
The fence calculator has an initial height check using the cited England thresholds. It does not make a legal determination, cover Wales, Scotland or Northern Ireland, or account for every planning condition. Check current official guidance for your location before ordering panels, especially if the fence is adjacent to a road or forms part of a listed property.
Order and install with the product details
Before ordering, compare the exact panel width and height, post type, gravel-board size and fixing method on the quote. Ask how the supplier expects panels to meet at corners and what treatment is needed for cut timber. Check stock and delivery lead times, because an otherwise accurate count can still leave a run incomplete if one special component is unavailable.
Post-mix quantity depends on the standard-post allowance in the cited product data and the number of standard positions. Ground conditions, hole dimensions, post length, wind exposure, gate loads and the site design may require more material or a different foundation. The estimate does not test those structural conditions. Use a qualified installer or engineer where loads, retaining pressure or unstable soil are involved.
Fence installation can involve heavy panels, digging and cementitious products. Follow the current manufacturer directions and safety data sheet, protect underground services, use safe lifting and wear the specified protective equipment. Keep the calculation with the supplier quotation so changes in run length, product width or gate layout can be checked before work begins.
Before you finalize the estimate
Walk the boundary and record straight runs, changes in direction, slopes, gate openings and terminal points. Panel widths are product-specific and a remaining gap may need a cut panel or a different bay arrangement. Confirm the supplier’s installed bay width and post arrangement before converting the estimate into an order.
Check the proposed fence line, ownership boundary, underground services and local height restrictions before digging. Use post-mix instructions for the actual bag and site conditions. The quantity calculator does not design foundations or establish whether the fence needs approval.
Make it your project.
Use the supporting calculator with your measured dimensions and the product you plan to buy. Read its worked example, sources and assumptions before ordering.
Frequently asked questions
How many 1.83 m panels do I need for 10 m?
The calculation is ceil(10 ÷ 1.83), which gives six panels. Confirm the final bay and post system with the supplier.
How many posts do I need for six panels?
One straight run has seven standard positions: a post at each end and one between adjacent panels. Corners, extra runs, slopes and gates change the layout.
How many post-mix bags for seven fence posts?
The cited Tarmac example states one 20 kg bag per standard fence post, so seven standard posts give seven bags in that product example. Gate posts are not covered by that allowance.
Does this fence estimate include gates?
You can enter gates to count two gate-post positions each. The estimate does not include gate-post concrete or gate hardware.
What fence height can I build without permission?
Planning Portal gives England-specific conditions of 1 m beside a vehicle highway or its footpath and 2 m elsewhere, with listed exceptions. Check current local rules.
For general information only, not professional advice. Rules and prices change, so check the official sources below. Use your own judgement and speak to a qualified professional before you act.
Sources
- Standard close-board fence panel specificationsChecked on
- Naylor weather-proof fencing solutions: gravel-board sizesChecked on
- Jacksons timber gravel board specificationChecked on
- Tarmac Postmix technical data sheetChecked on
- Planning Portal: fences, gates and garden walls (England guidance)Checked on