Post-Mix vs Concrete for Fence Posts
Compare UK manufacturer post-mix guidance with a measured-hole concrete yield example and clear installation limits.

In this guide
What post-mix is
Post-mix is a factory-blended product marketed for fixing posts. The Tarmac technical sheet describes its Postmix as cement, additives and graded aggregates, and says one 20 kg bag is required per standard fence post. It also gives an application sequence, water guidance and temperature limits. Those figures belong to that named product and its standard-post example; they do not establish what every post, gate or soil condition needs.
Traditional bagged concrete is also a pre-blended material, but it is usually measured by the volume it yields after mixing. The cited Tarmac High Strength sheet states 0.01 m³ per 20 kg bag. That allows a volume estimate once the hole and post dimensions are known. The product label and use instructions still matter: a general concrete mix should not be treated as interchangeable with a rapid post-setting product just because both arrive in bags.
Compare the quantities without mixing assumptions
The UK fence calculator estimates posts and post-mix bags from panel runs and the manual bags-per-standard-post allowance. It does not use hole dimensions and does not calculate a traditional-concrete alternative. For a straight 10 m run, five panels at the calculator’s 1.83 m panel example require six standard support positions. Entering one sourced bag per standard position gives six Postmix bags; gates and their concrete are excluded from that example.
A separate geometry example shows why hole dimensions matter for ordinary concrete. A 300 mm round hole, 600 mm deep, around a 100 mm square post contains about 0.0364 m³ of fill after subtracting the post. Dividing by the cited 0.01 m³ per bag gives four 20 kg bags per hole after rounding up. This is an arithmetic example using chosen dimensions, not the same basis as the Tarmac one-bag standard-post statement. Do not infer that one product is short or that four bags are required for your fence.
| Estimate | Basis | Illustrative result |
|---|---|---|
| Tarmac Postmix | Manufacturer allowance for a standard fence post | 1 × 20 kg bag per standard post |
| Tarmac High Strength concrete | 0.0364 m³ measured annular hole ÷ 0.01 m³ per bag | 4 × 20 kg bags for the chosen hole dimensions |
| 10 m straight fence run | 5 panel bays, 6 standard positions, one-bag allowance | 6 Postmix bags |
Strength, set and installation time
The Postmix sheet says initial set is typically 5 to 10 minutes depending on conditions and asks for about 2.5 litres of clean water per 20 kg bag. It says cool conditions retard setting and warm conditions accelerate it. A quick initial set is not the same as full strength or permission to load the post immediately. The sheet also calls for temporary support when battens are used. Read the current bag and technical sheet for the product actually supplied.
The High Strength concrete data sheet is a different product with a published bag yield. Its yield helps estimate volume, but a take-off does not set the mix, strength class, embedment, post alignment or curing plan. If the fence maker specifies a product or installation sequence, follow that specification. Never combine the water instructions from one product with another bag.
When each option may suit
A purpose-made post mix may suit a standard post installation where its instructions fit the post, soil and temperature. A conventional concrete may be selected where the project design or supplier calls for a specified mix and a measured volume can be prepared. Price, availability, lifting, mixing access, working time and the need to brace each post also affect the choice. Those are project-specific trade-offs rather than a universal winner.
Gate posts, corners, retaining conditions, heavy panels, exposed sites and soft or filled ground can need a different footing from a standard fence post. Ask the fence supplier or a qualified installer to confirm the hole, post and concrete specification. The calculator counts materials; it does not calculate wind loads, footing capacity or ground bearing.
Safety before mixing or digging
Bagged cement products can irritate or injure skin and eyes, and dust should not be inhaled. Read the safety data sheet, use its protective equipment, handle bags safely and keep the mix away from children and pets. Check underground services before digging, secure the post while the mix sets and protect fresh concrete from conditions named in the product instructions.
If the hole becomes unstable, waterlogged or larger than the plan, pause and get advice rather than filling it with extra material by guesswork. Keep the product name, batch and installation record with the fence paperwork so any later maintenance can be matched to the material used.
Before you finalize the estimate
A material count cannot resolve the footing design. Check the fence maker’s post embedment, wind exposure and soil requirements, and use the current instructions for the product delivered. The calculator’s one-bag setting is a per-standard-post estimate and leaves gate-hole concrete out.
For ordinary concrete, preserve the dimensions used in the volume arithmetic and confirm the exact mix yield on its data sheet. Do not combine the Tarmac Postmix allowance with another product’s water, setting or yield information. Consult a qualified installer for gates, retaining loads or uncertain ground.
Make it your project.
Use the supporting calculator with your measured dimensions and the product you plan to buy. Read its worked example, sources and assumptions before ordering.
Frequently asked questions
How many bags of post-mix per fence post?
The cited Tarmac sheet states one 20 kg bag for a standard fence post. Check the current instructions and do not extend that example to a gate post or unusual hole without confirmation.
How many ordinary concrete bags are needed per post?
Measure the filled hole volume, subtract the part occupied by the post, then divide by the yield on the exact concrete bag. The chosen example here gives four 20 kg bags, but different dimensions or product yield change the result.
Does post-mix set in five minutes?
The Tarmac sheet gives a typical initial set of 5 to 10 minutes depending on conditions. That does not mean the post is fully cured or ready for all loads.
Can I use post-mix for gate posts?
The cited one-bag rate applies to a standard post. Gate posts can have different loads and hole requirements, so use the gate and fence manufacturer’s instructions or ask an installer.
Does the fence calculator compare post-mix with concrete?
No. It estimates post-mix from the selected fence layout and bags-per-post input. A separate volume calculation needs hole dimensions and the chosen concrete yield.
For general information only, not professional advice. Rules and prices change, so check the official sources below. Use your own judgement and speak to a qualified builder or engineer before you act.
Sources
- Standard close-board fence panel specificationsChecked on
- Naylor weather-proof fencing solutions: gravel-board sizesChecked on
- Jacksons timber gravel board specificationChecked on
- Tarmac Postmix technical data sheetChecked on
- Planning Portal: fences, gates and garden walls (England guidance)Checked on
- Tarmac High Strength Concrete technical data sheetChecked on